Hello, welcome to the website of Suzhou Lingxi Purification Engineering Co., Ltd!

Professional Cleanroom Engineering

A one-stop service provider for design, construction, installation, maintenance, and renovation

24-hour hotline£º0512-63432919
18861091720

Location£º Home>>News and information>>News

Recommended products

  • Rock wool purification manual board
  • Mechanism silica sandwich panel
  • Paper honeycomb color steel purification board
  • Mechanized polyurethane sandwich panel
  • Rock wool color steel purification board
  • Gypsum rock wool purification manual board
The boards in the purification workshop

Publisher:Suzhou Lingxi Purification Engineering Co., Ltd. ©¦ Click count£º201 ©¦ Publication time£º2024-02-01 15:04:33 ©¦ close

  Insulation board
This type of material is commonly prepared using colored steel plates from purification workshops, including some rock wool or glass magnesium colored steel plates. The thickness of the material is generally around 50,75100 millimeters. In the selection of insulation boards in the purification workshop, it is also necessary to analyze their fireproof materials. With higher accuracy, the thickness will also increase. The stronger the fireproof ability, the more expensive the price.
Aluminum alloy material
This type of material is generally U-shaped material, T-shaped ceiling material, as well as various materials such as inner and outer circles, angle aluminum, etc.
Surface material
The surface material of the purification workshop needs to meet necessary waterproof requirements, including temperature requirements for the surface. Generally, resin material can also be PVC.
lighting
The requirements for indoor lighting in the purification workshop are also important. Firstly, it should not be too dazzling, and secondly, it should be able to see clearly. Auxiliary workers need to use some reasonable layout techniques to assist in their work, and LED materials are commonly used. The tightness of the transmission on the material of the wind force, including some application requirements, needs to operate normally. The refrigeration requirements and the air supply device need to be interrupted, and the air supply device needs to be turned off.
After selecting the type of board, it is also necessary to design the overall layout and construction
The overall layout of the workshop construction is constructed as follows:
1. When entering sterile construction, it is necessary to open more corridors and build them in the operating space.
2. Separate the operating space of the purification workshop from the partition.
3. Internal UV disinfection is required, and the overall distribution needs to be evenly distributed to ensure comprehensive disinfection without blind spots.
4. It is necessary to have its own independent experimental table, and the distance between ultraviolet radiation and the table should not exceed 1.5 meters.
5. Two layers of windows are needed to connect the space and operational space.