| 1. Purification engineering walls and roof panels are generally made of 50mm thick sandwich color steel plates, which are characterized by aesthetics and strong rigidity. Arc wall corners, doors, window frames, etc. are generally made of specialized aluminum oxide profiles. 2. The purification project floor can be made of epoxy self flowing floor or high-grade wear-resistant plastic floor. For anti-static requirements, anti-static type can be selected 3. The return air duct is made of hot-dip galvanized sheet and coated with flame retardant PF foam plastic sheet with good purification and insulation effect. 4. The high-efficiency air supply outlet is equipped with a stainless steel frame, which is aesthetically pleasing and clean. The perforated mesh is made of baked aluminum plate, which is rust free and dust-free, and is suitable for cleaning. 5. Reducing the content of suspended particles in purified environmental air and effectively removing existing solid particles have always been the main contents of production process control. When planning and constructing purification engineering, how to achieve maximum benefits with minimal investment and complete maximum output has always been a highly valued issue for purification engineering designers. Efficient economic design schemes are the only choice to achieve good benefits. The optimization and re optimization of purification engineering manufacturers' design schemes is more about how to effectively control the cost of clean engineering in cost accounting and control, It has always been a difficult task for purification engineers. Purification engineering - crucial in the design process of purification engineering; The cleanliness level of purification engineering, materials used in purification engineering, air conditioning systems, cleanroom enclosure structures, and floor engineering are the main factors that affect the cost of purification engineering, cleanroom cost, and purification engineering cost - purification engineering cost, cleanroom price, cleanroom quotation - several factors that affect the cost of purification engineering in cleanrooms:
1. The planning of the project first needs to strengthen the design unit's design and purification of engineering drawings on paper External supervision and review of quantity. Fully leverage the functional role of the cleanroom drawing review center, just like the engineering quality supervision station supervising construction quality, to review and supervise design quantity. The quality of clean engineering drawings is the soul of the construction cost control of this clean engineering project. 2. The method for standardized design estimation of clean engineering requires comprehensive review by the engineering standard quota cost management station and China Construction Bank to establish the design estimation. The determined investment limit is used as the cost base, which can eliminate artificially expanding the design scale and calculating costs. 3. Develop a design reward and punishment system. If the design drawings are confirmed as excellent designs by the review center, special honors should be given to the design unit and rewards should be given to the design personnel. 4. Develop "quota design" standards. Limit design is an effective control method in the process of engineering construction, and it is also one of the effective measures to control investment scale. Therefore, it is an important task in design management to organize relevant departments as soon as possible to develop appropriate quota design standards based on different types, scales, and cleanliness requirements of buildings, as a "comparison table" for the design department 5. Promote the application of the "four new" achievements in engineering design. Optimize the technical and economic indicators of purification engineering design with new technologies, materials, processes, and equipment, enhance the technological content of the industry, and enhance the comprehensive benefits of the project. Secondly, grasp the key points and strengthen the control of project construction processes. Implementing project management before the start of the project is an effective way to improve labor productivity and economic benefits; Strengthening project cost management and reducing the cost of purification projects are of utmost importance in project management. Like the quality of purification projects, they are the lifeline of enterprises. The use of currency to comprehensively manage the consumption of management objects during the project construction process, and the use of standard cost for project cost management is an effective method. The specific method for cost control of Hunan Chunzhen Clean Engineering is recommended: 1. Establishing a project cost responsibility system and promoting project management is a construction management method that implements the project manager responsibility system. Project cost management should be led by the project manager, who should assign responsibility for all aspects of cost management to individuals, conduct separate accounting and analysis, and establish a cost accounting responsibility system; Establish sound original cost records, strictly adhere to the scope of cost expenditures, use various methods of cost management, conduct dynamic analysis of construction activities in a timely manner, and explore cost potential from various links and positions. 2. Adopting cost difference assessment method. The difference between actual cost and standard or budgeted cost is called cost difference. During the construction period of an engineering project, due to various reasons, the actual cost incurred does not match the budgeted cost and the standard cost formulated by the enterprise, resulting in unfavorable and favorable differences. Through assessment, timely identify differences and provide feedback. The cost difference is divided accordingly. 3. The method for standardized design estimation of clean engineering requires the establishment of design estimation through engineering standard quota cost management station and China Construction Bank, etc
5. Develop "quota design" standards. Limit design is an effective control method in the process of engineering construction, and it is also one of the effective measures to control investment scale. Therefore, it is an important task in design management to organize relevant departments as soon as possible to develop appropriate quota design standards based on different types, scales, and cleanliness requirements of buildings, as a "comparison table" for the design department 6. Promote the application of the "four new" achievements in engineering design. Optimize the technical and economic indicators of purification engineering design with new technologies, materials, processes, and equipment, enhance the technological content of the industry, and enhance the comprehensive benefits of the project. Thirdly, seize the key and strengthen the control of the engineering audit process. The audit of purification engineering projects must audit the entire construction and production process of the project. The audit of engineering projects should not only focus on the post audit and completion audit of the audited project, but also on pre audit and in audit. Pre audit can make the preparation of construction plans for purification engineering projects more reasonable, And it can help the engineering project management team to "check" in advance, effectively preventing or avoiding foreseeable errors. In process audit refers to the audit of several processes during the construction phase. For the later stage, it is oriented towards the future and belongs to pre audit. However, this type of pre audit is more targeted and effective. If done well, it can achieve twice the result with half the effort. At the same time, the production process of purification products has significant fluctuations in the demand for resources, especially labor and capital. It requires labor from different professional professions to carry out construction operations on the same product at different times, thereby causing the production process of cleanroom decoration products to have peaks and valleys in demand for labor resources. In summary, from an economic perspective, the competition in the purification engineering and purification engineering decoration market is mainly based on cost competition. Therefore, whoever can ensure the construction period and quality, pay attention to cost management, control and grasp reasonable costs, and obtain maximum benefits with the minimum cost in the clean room field competition can take the initiative and achieve success. |